🇨🇦 Queen

Toronto Subway station

Queen is station 15 of 38 on the Yonge-University Line of the Toronto Subway. On weekdays the first train leaves between 05:58 and 06:04 and the last between 25:47 and 25:50.

Station facts

Lines
Yonge-University Line
Yonge-University Line
Station 15 of 38, between Finch and Vaughan Metropolitan Centre

Next stations

  • Yonge-University Line from TMU to King

First and last train from Queen

TowardsDaysFirstLast
Vaughan Metropolitan Centre (Yonge-University Line)Monday to Friday05:5825:47
Vaughan Metropolitan Centre (Yonge-University Line)Saturday06:0725:45
Vaughan Metropolitan Centre (Yonge-University Line)Sunday08:1925:45
Finch (Yonge-University Line)Monday to Friday06:0425:50
Finch (Yonge-University Line)Saturday05:5725:47
Finch (Yonge-University Line)Sunday08:2125:47

Scheduled departures from this station. Check the operator for holidays and disruptions.

How often trains run

Towards06:00 to 09:0009:00 to 17:0017:00 to 21:00after 21:00
Vaughan Metropolitan Centre (Yonge-University Line)2.5 min3.9 min2.7 min5 min
Finch (Yonge-University Line)2.5 min3.9 min2.7 min5 min

Median gap between scheduled departures on weekdays.

From Queen to the main stations

ToStopsChange atRide timeFare
Union2—3 minCA$3.30
Bloor-Yonge4—5 minCA$3.30
St George8—12 minCA$3.30
Spadina9—14 minCA$3.30
Kennedy17Bloor-Yonge28 minCA$3.30
Sheppard-Yonge12—24 minCA$3.30
Finch14—27 minCA$3.30
Eglinton9—14 minCA$3.30
Vaughan Metropolitan Centre23—48 minCA$3.30

Ride time is on the trains only; walking between platforms at a change is not in the operator's data. Plan any trip.

Entrances and lifts

Entrance armLiftEscalatorStaircase

As listed in the operator's published station data. Lift availability on the day can differ; ask station staff.

Contains information licensed under the Open Government Licence – Toronto. Figures come from the operator's published data (feed valid from 3 November 2026); see how we verify. All Toronto Subway stations.