Fairbank is station 4 of 25 on the Eglinton Line of the Toronto Subway. On weekdays the first train leaves between 05:51 and 06:20 and the last between 25:26 and 25:59.
Station facts
- Lines
- Eglinton Line
- Eglinton Line
- Station 4 of 25, between Mount Dennis and Kennedy
Next stations
First and last train from Fairbank
| Towards | Days | First | Last |
|---|---|---|---|
| Kennedy (Eglinton Line) | Monday to Friday | 05:51 | 25:26 |
| Kennedy (Eglinton Line) | Saturday | 06:08 | 25:26 |
| Kennedy (Eglinton Line) | Sunday | 07:43 | 25:26 |
| Mount Dennis (Eglinton Line) | Monday to Friday | 06:20 | 25:59 |
| Mount Dennis (Eglinton Line) | Saturday | 06:19 | 25:59 |
| Mount Dennis (Eglinton Line) | Sunday | 08:09 | 25:59 |
Scheduled departures from this station. Check the operator for holidays and disruptions.
How often trains run
| Towards | 06:00 to 09:00 | 09:00 to 17:00 | 17:00 to 21:00 | after 21:00 |
|---|---|---|---|---|
| Kennedy (Eglinton Line) | 3.7 min | 3.8 min | 3.8 min | 6.6 min |
| Mount Dennis (Eglinton Line) | 3.7 min | 3.8 min | 3.8 min | 6.6 min |
Median gap between scheduled departures on weekdays.
From Fairbank to the main stations
| To | Stops | Change at | Ride time | Fare |
|---|---|---|---|---|
| Union | 12 | Cedarvale | 22 min | CA$3.30 |
| Bloor-Yonge | 11 | Eglinton | 18 min | CA$3.30 |
| St George | 6 | Cedarvale | 13 min | CA$3.30 |
| Spadina | 5 | Cedarvale | 11 min | CA$3.30 |
| Kennedy | 21 | — | 41 min | CA$3.30 |
| Sheppard-Yonge | 9 | Eglinton | 19 min | CA$3.30 |
| Finch | 11 | Eglinton | 22 min | CA$3.30 |
| Eglinton | 6 | — | 9 min | CA$3.30 |
| Vaughan Metropolitan Centre | 13 | Cedarvale | 28 min | CA$3.30 |
Ride time is on the trains only; walking between platforms at a change is not in the operator's data. Plan any trip.
Entrances and lifts
| Entrance arm | Lift | Escalator | Staircase |
|---|
As listed in the operator's published station data. Lift availability on the day can differ; ask station staff.
Contains information licensed under the Open Government Licence – Toronto. Figures come from the operator's published data (feed valid from 3 November 2026); see how we verify. All Toronto Subway stations.